Magento Open Source upgrade proposal: 2.4.8-p5, your options

Prepared for: Shoof
Prepared by: MageBinary
Date: November 2026

Your support runs until 31 May 2028

Your store runs Magento Open Source 2.4.8-p5. Adobe's standard support for 2.4.8 runs until 31 May 2028. Until then Adobe keeps releasing security patches for it, so your store stays patched as long as those patches keep being applied.

This means the upgrade is not urgent. You have time to choose the path that costs you least, and we recommend you use it.

Adobe now ships one full Magento release a year, in May. The next one, 2.4.10, is already in early testing: its first preview (2.4.10-alpha1) came out in October 2026.

Our recommendation

Option A (recommended): wait for 2.4.10 and upgrade once, in the second half of 2027.

Option B: move to 2.4.9 sooner.

Either way: keep the monthly security patches applied on 2.4.8 until the upgrade is live. We do this as part of your existing support arrangement.

What the upgrade involves for your store

2.4.9 is the largest change to Magento's internal framework in the 2.4 line. It adds few new features for merchants, and we do not sell it on new features or speed. The reason to move is support, and 2.4.10 builds on the same changes.

Three internal parts of Magento are replaced in 2.4.9:

Extensions and custom code that use the first two directly need updating. Because of this, extension upgrades are the largest part of the work.

Size of the job: moderate.

For 2.4.9, Adobe's current server requirements are PHP 8.5, MariaDB 12.3 or MySQL 8.4, OpenSearch 3, Valkey 9, RabbitMQ 4.3, Varnish 8 and Composer 2.10. Adobe has not yet published the requirements for 2.4.10.

Estimate

We are not quoting hours or a price in this proposal.

Assumptions

Not included

Timeline for option A (recommended)

When What happens
Now to mid 2027 Your store stays on 2.4.8, with monthly security patches applied
Around May 2027 Adobe is expected to release 2.4.10. We check its requirements against your 21 extensions and send you an estimate.
Second half of 2027 After 2.4.10's first patch: upgrade and testing on a separate copy of your store
Before the December 2027 trading freeze Release to your live store, then monitoring after release
31 May 2028 Adobe support for 2.4.8 ends. On option A, your store is planned to be on 2.4.10 by then.

If 2.4.10 is late or brings new breaking changes, we move you to 2.4.9 instead, well before 31 May 2028. If you choose option B, we agree its timing with you and keep it clear of the December and January trading freeze.

Risks and how we manage them

Risk Likelihood Impact How we manage it
Monthly patches on 2.4.8 are not applied while we wait Low High We keep patching inside your existing support arrangement
2.4.10 is late or brings new breaking changes Medium Medium We review at 2.4.10's release and fall back to 2.4.9 well before May 2028
An extension has no compatible version Low Medium Discovery flags it early. A replacement is quoted separately.
Admin content displays differently after the editor change Medium Low Admin content editing is part of testing
Custom code needs more work than expected Low Medium Code scan in discovery, and the contingency line in the estimate

Each of these steps reduces exposure. None of them removes risk completely.

Next step

A 15-30 minute call to choose option A or option B. If you choose option A, we confirm the patch routine and come back to you when 2.4.10 is released. If you choose option B, we send you the reviewed estimate.


Appendix A: extension list

Your store has 21 third-party extensions. Before we quote either option, we list each one with its current version and the target version that supports the release you choose. Any extension with no compatible version is marked, with the replacement options.

Extension Vendor Current version Target version Notes
To be completed in discovery